CASE
YOUR POSITION:HOME > CASE > CASE1

Steel Wire Rope for Tower Crane

2020/9/21 14:45:59

暂无图片。

Details

A lifting platform is installed on the vertical guiding rails through a plurality of guiding wheel sets and guiding wheels. A head sheave is installed in the center of the top end of the bearing principal cord. One end of the traction steel wire rope is connected with the winch, and the other end of the traction steel wire rope is wound around the head sheave to be connected with the top end of the lifting platform. The lifter is installed inside the iron tower. The lifter is more stable in structure, wider in application range and more flexible. After the lifter is installed inside the iron tower, maintenance and installation devices can be rapidly conveyed, an operator can be rapidly conveyed to a working position, and meanwhile the roomy and stable working platform with any height can be provided for the operator.

HOME | ABOUT | RECRUIT | SITEMAP

Copyright Oriking Metal All Rights Reserved